Selby CHP STOR

View PDF

HEADLINES

20 megawatt combined heat and power on-site energy generation STOR

80% of the site’s pipework fabricated off-site

10 tonnes of steel and copper works made in our specialist facility

8 eighteen inch stainless steel flue pieces among the large-scale fabrications made and delivered

Project TitleSelby CHP STOR
LocationSelby, North Yorkshire
Value£580,000
Duration20 weeks

OVERVIEW

We assembled a 16-strong team of engineers, welders, site supervisors and project managers to deliver the scheme that had been pre-designed by the client.

We fabricated and installed all the components required for this industrial scale, purpose-built CHP on-site energy generation facility.

The five-month-long scheme demonstrates our capacity as the site has the potential to generate 20 Megawatts of energy in just seven seconds.

CHALLENGE

Given the facility’s industrial size, large individual components were made bespoke in our factory, such as eight, 18” diameter flue pieces and a 12” gas main that was 120m long. Additionally, we fabricated the equivalent of one mile of oil and lube lines for the gas fired turbine engines.

SOLUTION

Our works included fabrication, off-site checking, delivery, installation, (including various crane lifts), connection and onsite testing.

We installed over 10-tonnes of steel pipework and in total, 80% of the pipework was prefabricated in our facility.

RESULTS

A high level of planning and liaison with the client’s project team ensured the works were delivered ahead of schedule and defect-free.